Acc349 Managerial Accounting: E2-6 A job cost sheet of Battle Company is given below

Acc349 Managerial Accounting

E2-6
A job cost sheet of Battle Company is given below.
Job Cost Sheet
Job No. 469 Quantity: 2,000
Item: White Lion Cages Date Requested: 7/2
For: Tesla Company Date Completed: 7/31
Date Direct Materials Direct Labor Manufacturing Overhead
7/10 828
7/12 900
7/15 440 528
7/22 380 456
7/24 1,600
7/27 1,500
7/31 540 648

Instructions
(a) Answer the following questions.
(1) What are the source documents for direct materials, direct labor, and manufacturing overhead costs assigned to this job?
(2) What is the predetermined manufacturing overhead rate?
(3) What are the total cost and the unit cost of the completed job?
(b) Prepare the entry to record the completion of the job.
Powered by